EEM neglible change in different Runs

5 posts / 0 new
Last post

I am running an EEM wizard where I changing the Roof R-Value from R-42 to R-24.

Here are my results. (almost the same) Am I missing something.
Base Results:
[cid:image001.jpg at 01CE1366.4A1560B0]

EEM with Roof R-24.
[cid:image002.jpg at 01CE1366.4A1560B0]

MICHAEL RAIVA, P.Eng., LEED(r) AP, CCGD(r)

Mike Raiva's picture
Offline
Joined: 2013-02-14
Reputation: 0