LEED/ ASHRAE baseline

3 posts / 0 new
Last post

Dear All,

If for my proposed building I have an air-cooled chiller, and for my
baseline building according to ASHREA I have a ?2-water-cooled screw
chillers sized equally?. Does that mean I have to change the system type
for my proposed building from air-cooled to water-cooled chiller??

Can someone please clarify and thanks for your help.

Hind Dirani's picture
Offline
Joined: 2011-09-30
Reputation: 0