VisualDOE unmet load hours

2 posts / 0 new
Last post

I?m trying to find the unmet load hours for the purposes of a LEED EAc1 template.

I can get them on a room-by-room basis from the Simulation > Diagnostic tab ? is there a summary of the total heating and cooling in the reports we can point to for documentation purposes?

Thanks kindly,

Christopher F. Zabaneh

Christopher Zabaneh's picture
Joined: 2011-10-02
Reputation: 0