Which report is used for unmet load hours, SS-R or BEPS?

2 posts / 0 new
Last post

Dear folks,

I am always confused which report I shall use to count unmet load hours. The
under-cooled or heated hours to be summed in the SS-R is different from
PERCENT OF HOURS ANY SYSTEM ZONE OUTSIDE OF THROTTLING RANGE to be
multiplied by 8760 hours.

Please advise which numerb I shall use to fill in the LEED EA Cr1 template.

Thanks a lot.

Jessi

Jessica XP's picture
Offline
Joined: 2011-10-02
Reputation: 0