Hi,
I have noticed that sometimes the following two lines are added to the BEPU report:
?Hours any zone above cooling throttling range
Hours any zone below heating throttling range? please refer to the below report for the example.
For LEED I didn?t know if I should just use the % in this case 9.54% or the actual hours specified?
The LEED reviewers came back and said that I needed to use the hours however I would have thought the %?
Christie Rimes, LEED BD+C