LEED Baseline Set Up

2 posts / 0 new
Last post

A proposed building will only use H&V for a warehouse type space.

Is it possible to use the normal HVAC baseline system (mapped to be system 11, 'packaged RTU) and then ONLY H&V for proposed?

Thank you

Michelle R. Contri, PE

Contri, Michelle's picture
Joined: 2011-10-02
Reputation: 0