I'm working on a simulation with FCU and some SZRH units. In the output I'm getting a warning that I've not encountered before:
**CAUTION**********************************************************************
System: EL3 Sys8 (PSZ) (G.N1) could not successfully
allocate all energy to the 5-minute bins during
heating because of an equipment overload. The peak
load used in ECONOMICS will not include the fraction
due to the overload, but the PLANT reports will.
Mon/Day/Hour: 1 3 7 Energy: 1.4 Unallocated: 0.082
Could someone explain what this means? SYS8 is a chilled water SZRH.