Dear Modeler,

I have got below "CAUTION" "& WARNING" from eQuest report. I wonder if anyone can help what it does mean, or a reference to interpret it.

**CAUTION**********************************************************************

System: AHU-B-01-Female Spa could not successfully

allocate all energy to the 5-minute bins during

heating because of an equipment overload. The peak

load used in ECONOMICS will not include the fraction

due to the overload, but the PLANT reports will.

Mon/Day/Hour: 1 1 3 Energy: 37.3 Unallocated: 0.254"

**WARNING**********************************************************************

Zone: 1stb Kitchen&Tlt Zn could not successfully

allocate all equipment energy to the 5-minute bins

because of an equipment overload. The peak load

used in ECONOMICS will not include the fraction due

to the overload, but the PLANT reports will.

Mon/Day/Hour: 12 29 7 Energy: 42.2 Unallocated: 3.443

Regards,

Wahid H. Mohamed, BSc, LEED AP BD+C