Hi everyone,
I encountered following warning for multiple zones in an energy model:
* Zone: EL2Core Zn (G.C19) could not successfully allocate all
equipment energy to the 5-minute bins because of an equipment
overload. The peak load used in ECONOMICS will not include the
fraction due to the overload, but the PLANT reports will.
Mon/Day/Hour: 1 1 10 Energy: 1.4 Unallocated: 0.707 *
Can this be ignored or will it have impact on energy consumption? Kindly
reply with the solution if anyone else has encountered this warning and
successfully removed it.
Regards.
Rushi.