Unusual Warnings

2 posts / 0 new
Last post

Hi everyone,

I encountered following warning for multiple zones in an energy model:

* Zone: EL2Core Zn (G.C19) could not successfully allocate all
equipment energy to the 5-minute bins because of an equipment
overload. The peak load used in ECONOMICS will not include the
fraction due to the overload, but the PLANT reports will.
Mon/Day/Hour: 1 1 10 Energy: 1.4 Unallocated: 0.707 *

Can this be ignored or will it have impact on energy consumption? Kindly
reply with the solution if anyone else has encountered this warning and
successfully removed it.

Regards.
Rushi.

Rushi Quest's picture
Offline
Joined: 2019-12-11
Reputation: 0

Hi Rushi,

The problem causing factor as per me can be the height setted factor in the
model.
The problem can be due to the unusual setting height of the core zone
EL2Core Zn (G.C19)
Try fixing this and then have a look at the correction in the model and
result.

Best of luck.

*Thanks and regards,*
Sharad.Kumar.
Freelancer

.............................................................................................................................................

---------- Forwarded message ----------
From: Rushi Quest
To: equest-users at lists.onebuilding.org
Cc:
Bcc:
Date: Mon, 9 Dec 2019 15:13:38 +0530
Subject: [Equest-users] Unusual Warnings
Hi everyone,

I encountered following warning for multiple zones in an energy model:

* Zone: EL2Core Zn (G.C19) could not successfully allocate all
equipment energy to the 5-minute bins because of an equipment
overload. The peak load used in ECONOMICS will not include the
fraction due to the overload, but the PLANT reports will.
Mon/Day/Hour: 1 1 10 Energy: 1.4 Unallocated: 0.707 *

Can this be ignored or will it have impact on energy consumption? Kindly
reply with the solution if anyone else has encountered this warning and
successfully removed it.

Regards.
Rushi.

Sharad Kumar2's picture
Offline
Joined: 2015-05-21
Reputation: 0