Hello,
I have a warning message:
"Zone: EL2 Core Zn (G.C2) could not successfully
allocate all equipment energy to the 5-minute bins
because of an equipment overload. The peak load
used in ECONOMICS will not include the fraction due
to the overload, but the PLANT reports will.
Mon/Day/Hour: 1 3 8 Energy: 0.6 Unallocated: 0.004"
Can somebody tell me what this means and how I can fix this?
Thanks in advance.
Ashok