Dear All,
Is there any minimum ventilation requirement for the server/UPS room in
compliance with 62.1-2007?
Apologies for the cross posting as this is not directly linked with
simulation based problem.
Thanks in advance,
--
Javed Iqbal, LEED AP, CEA
Sr. Energy Analyst
I use either "computer (not printing)" or "electrical equipment room" which have basically the same vent requirements just whether you want to consider it occupied or not.
Thanks,
Matthew J. Baron, PE