Scheduling for an Elevator Motor

2 posts / 0 new
Last post
I am working on an energy model for a Medical Office Building, and I am hoping that someone may have a good resource for scheduling elevator operation. Has anyone had experience with this? I have the elevator motor HP entered and I am using a basic schedule, but it is basically an assumption or educated guess at percent utilized each hour. I am hoping for something a little more scientific, or at least corroboration with my assumptions. Thanks,
cmeoska's picture
Offline
Joined: 2010-10-05
Reputation: 1