Wall Construction

1 post / 0 new

I am modeling a school that is going for LEED and currently having trouble
when trying to have it comply. The building is in CA and needs to meet the
T-24 compliance as well. When I run the compliance analysis, it does not
comply because of the wall and roof construction were not checked off in the
detailed mode. However, when I check off the T-24 in the detailed mode, the
compliance report drastically changes from 15% under to about 10% over. The
material in both the wizard and detailed mode are the same. Am I inputing
this data correctly?
Thanks for your help,
Steven Rutter

steven rutter's picture
Offline
Joined: 2011-09-30
Reputation: 0