Query: Plotting Data on Psychometric chart

8 posts / 0 new
Last post

Mr. Khalid,
The file was not working properly for me, but I see that there are two data
series; one for room temperature/humidity and another for outdoor
temperature/humidity. It seems that you can just add more data series.

James V Dirkes II, PE's picture
Joined: 2011-10-02
Reputation: 203

Have you tried Climate Consultant software? (as recommended by Mr Degelman)

James V Dirkes II, PE's picture
Joined: 2011-10-02
Reputation: 203

Not yet, installation on the way now. Looking forward to do my task through
it.

Thanks!

Regards,

*Waqas Khalid,*
Doctoral Student,
iKohza Wind Engineering for {Urban, Man-made, Artificial} Environment,
Malaysia-Japan International Institute of Technology *(MJIIT),*
Universiti Teknologi Malaysia-Kaula Lumpur Campus* (UTM-KL), *
Jalan Sultan Yahya Petra/Semarak,
54100 Kuala Lumpur.
Mobile No. +60183925882
Email: waqaskhalid03 at gmail.com

Waqas Khalid's picture
Offline
Joined: 2017-10-12
Reputation: 0

@Jim Dirkes: Yes you are right we can have two data series at most in this
unadaptable psychrometric chart mentioned by Christopher also

@Christopher: Well said Mr. Christopher! I always confuse with it's long
spelling....

Thanks!

Regards,

*Waqas Khalid,*
Doctoral Student,
iKohza Wind Engineering for {Urban, Man-made, Artificial} Environment,
Malaysia-Japan International Institute of Technology *(MJIIT),*
Universiti Teknologi Malaysia-Kaula Lumpur Campus* (UTM-KL), *
Jalan Sultan Yahya Petra/Semarak,
54100 Kuala Lumpur.
Mobile No. +60183925882
Email: waqaskhalid03 at gmail.com

Waqas Khalid's picture
Offline
Joined: 2017-10-12
Reputation: 0

Hi Bill,

I am sorry for responding late.Thanks to all for their response. I am using
template shared by Dr. Juan-Carlos Baltazar for plotting my data. This
excel based sheet is simple and easy to plot the data and having ASHRAE
Standard 55 comfort zone identified in it.The problem in it that it is in
Bristish unit system and we cannot change the colour of plot to
differentiate the data of different buildings.

Thanks!

Regards,

*Waqas Khalid,*
Doctoral Student,
iKohza Wind Engineering for {Urban, Man-made, Artificial} Environment,
Malaysia-Japan International Institute of Technology *(MJIIT),*
Universiti Teknologi Malaysia-Kaula Lumpur Campus* (UTM-KL), *
Jalan Sultan Yahya Petra/Semarak,
54100 Kuala Lumpur.
Mobile No. +60183925882
Email: waqaskhalid03 at gmail.com

Waqas Khalid's picture
Offline
Joined: 2017-10-12
Reputation: 0

Since Excel can easily use different colors for different data sets,
consider how to display two data sets instead of a single set with data for
multiple buildings

James V Dirkes II, PE's picture
Joined: 2011-10-02
Reputation: 203

Thanks Jim Dirkes for comment.

I understand, you mean like we just add data series in excel graph plots
but the excel psychometric chart file shared with us by Dr. Juan which I am
using is different one. We just can key-in data and points are displayed in
psycometric chart in file but we cannot edit the chart nor the plotted
points in it. I am sharing again his file for reference.

Regards,

*Waqas Khalid,*
Doctoral Student,
iKohza Wind Engineering for {Urban, Man-made, Artificial} Environment,
Malaysia-Japan International Institute of Technology *(MJIIT),*
Universiti Teknologi Malaysia-Kaula Lumpur Campus* (UTM-KL), *
Jalan Sultan Yahya Petra/Semarak,
54100 Kuala Lumpur.
Mobile No. +60183925882
Email: waqaskhalid03 at gmail.com

Waqas Khalid's picture
Offline
Joined: 2017-10-12
Reputation: 0

The chart is on a chart sheet but you can?t revise the chart to add additional series.

PS. What is the difference between ?psychometric? and ?psychrometric?? This unadaptable psychrometric chart is driving me psycho!

Christopher R. Jones, P.Eng.
Technical Specialist
Sustainability & Energy

[cid:image004.png at 01D33CF8.D97CB120]
T +1 416-644-0252

2300 Yonge Street, Suite 2300
Toronto, ON M4P 1E4 Canada

wsp.com

Please consider the environment before printing...

Jones, Christopher2's picture
Joined: 2017-10-12
Reputation: 0