Hello All,
Has anyone ever run across the QC Details check of "CFM/ton of cooling"
error. The strange thing is that the summary shows that the HVAC loads
and volume are approximately correct. I have searched the archives and
have had no luck.
Then in the same format it says "Packaged Equipment Oversized" eQuest
performed the load sizing, I did not specify a size.
Best regards,
Tracy A. Black, P.E.; LEED AP