Performance Curves & Unmet Load Hours

1 post / 0 new

I'm using Daikin performance curves in a PVAV-VT system with other
prescribed inputs for VRF equipment for a substantially sized school and
cannot reconcile unmet load hours unless I remove the performance curves.

Any thoughts, beside the capacities are not appropriate?

Thanks in advance.

--
Matthew Higgins

Matthew Higgins's picture
Offline
Joined: 2011-09-30
Reputation: 0