Hello,
I'm modeling a CHW/HW system with a Fresh Air Unit (FAU). The FAU was originally Single Zone DX on accident, I switched the FAU over to the CHW/HW loop and now the "Monthly Energy Consumption" shows that the building is not heating and 99% of the electricity is for "Pumps & Aux." There are additional reports that show issues as well. The building also has appropriate unmet heating and cooling hours. Has anyone ever heard of such a problem?
Sincerely, Adam
Adam Rustige