Individual Process Loads

2 posts / 0 new
Last post

Hi all,

Just realized that I may have done a mistake now. All of my process loads
(computers, kitchen equipment, elevators, etc) are entered into the model
in the "Equipment" tab of internal loads. For the LEED form, I need to
separate these process end uses. I see no way of assigning each internal
load to a submeter. Do I now have to start over and model these process
loads as direct loads on separate sub-meters?

Thanks for any replies,

Omer Moltay, LEED AP