Back in March, the LEED CS 2.0 point thresh-holds were modified to clarify how modelers should exclude tenant loads from their % improvements for EA c1. (as attached)
Does anyone know if this also applies to LEED CS 2009 ?
I can't find any documentation either way.
Thanks!
Aaron Dahlstrom , PE, LEED(r) AP