Dear All,

Refer the following data.

A manufacturing building has the following area

Common area,office area = 22% of the building area which
contribute 13% of a/c requirement
Manufacturing area (clean room++) = 57% of the building area which
contribute 87% of a/c requirement
Un air-conditioned area = 21% of the building area.

Now this building needs LEED Certification.

To achieve EA Credit1, whether the clean room load(process) needs to be
considered in baseline design during modelling? or only we need to
consider the common area+office area+Unconditioned area.

Advance thanks for your valuable feedback.

Thanks and regards
Kathiresan