How do I model (for LEED) the fan power of the proposed design of a building that has 3 large air handlers (145,000 cfm each) all looping together? Do I put the combined HP of (180*3=540) 540 HP?
I think I can help, but got a few questions first:
What do you mean by "looping together"? This is certainly possible, but not sure what you mean by that. Do you have it as 1 system in TRACE? Or is it 3 systems? Or something else?
I think I can help, but got a few questions first:
What do you mean by "looping together"? This is certainly possible, but not sure what you mean by that. Do you have it as 1 system in TRACE? Or is it 3 systems? Or something else?