Hello,

I'm trying to model a data center with 200kW internal load. It has
dedicated PAC to meet the cooling load demand but after successfully
running the simulation, i don't get any cooling load in the summary report.
I tried to check the accuracy with equest default 5 zone model and i get
load of around 175 TR which makes sense. I tried everything in my working
model but unable to resolve this problem. Does anybody has come across
similar problem? Any help would be appreciated.

Thanks in advance.

--

Javed Iqbal, LEED AP, CEA