Simulation problems

2 posts / 0 new
Last post

Hi,

I was wondering could someone help me with my simulation. I'v been using EnergyPlus with openstudio for the last few months but still have not got the hang of it. I am using the software as part of my final year project. The project is reducing heat consumption in a manufacturing area by either reducing the set-point in the building or reducing the schedule. I have created the building in Google sketchup and entered all the available data into the openstudio application however when I change the set-points of the HVAC system the consumption does not change.

As I am new to this I probably have a host of things entered incorrectly and was wondering could some help me. Any help would be greatly appreciated.

David.

Dave88's picture
Offline
Joined: 2014-04-15
Reputation: 0