EEM Wizard Runs

3 posts / 0 new
Last post

I've got several simple residential models, and for all of them I model changes to the envelope, HVAC efficiency, lighting power density, etcetera.

The EEM Wizard is a great feature. I can take my "baseline" model and add more insulation, put in better windows, whatever I want to change.

The problem I'm having is that the EEM Wizard seems to be limited to a maximum of 13 runs. The EEM Wizard will allow me to enter more runs, but the output (Parametric Run Reports: Annual Building Summary) will only show 13 runs.

Am I missing something here?

Thanks.

Mark Campion

Campion Mark's picture
Offline
Joined: 2011-09-30
Reputation: 0