Hello everyone,
I am doing a case study about a office building in design builder(E+) using
the compact system (VAV with reheat +outside air set). While I set the
cooling setpoint schedule as only working during occupied hours(7-18), also
I check the E+ file that the schedule I set is right. However, when I
check the meter about the cooling coils consumption, I realizedthe cooling
coil and fans are still working during unoccupied hours, which confused me
a lot. Could someone experienced tell me the reason. Thanks so much.
Te Qi
Intern of EEB Hub