Hi all,
I'm modelling an office building with a floor area of more than 240000
sf.
The baseline system is system 8 VAV w/PFP boxes and I will need 2
equally sized centrifugal chillers.
My question is: how do the 2 chillers interact? Both of them working at
half load or one working at full load and the second one only working
when the first one is not enough?
ELENA VERANI