Did you create a rate block, and then assign that block to a utility?
What did you input into the block?
When you go into your "custom elec rate," you should have the cost
either plugged into the energy/demand tab, or under the blocks tab. I
usually assign ratchets to individual blocks under "block charges" and
then assign these blocks to the electric utility.