This might have been addressed before, but here goes anyway:

I'm modeling an existing building renovation for LEED NC v 2.2

In Table G 3.1 5(f) - I says that the baseline shall reflect work done
prior to revisions. Do you still need to do all four rotations? Do you
need to do the horizontal bands too?