This is a blank archive file that once opened will add the PGE E19 schedule and electric rate. The following assumptions in the file:
-The peak demand occurs during the on-peak hours (for a third demand type charged)
-The daily charge for the meter is $4.11 (E19 v or x is assumed, but this value needs to be changed for E19 S, P, or T)