Intro to Trace - Review

6 questions

  1. Match the building construction process to its equivalent field in Trace 700.

    Selecting a plot of Land
    Selecting cooling efficiency
    Picking out your fan type
    Laying out ductwork
    Deciding that you are going to build an office building

    You lose points by selecting incorrect options. You may leave an option blank to avoid losing points.

  2. Trace 700 is approved for LEED EA credit 1 calculations.

  3. Trace 700 is approved for EPACT calculations.

  4. Trace 700 can calculate which of the following?

    Building air conditioning loads

    Building Energy Consumption

    Annual operating cost of building.

    All of the above

  5. A common reason that Trace cannot calculate is that a user forgets to create rooms

  6. Match the button in Trace to it's analogous statement

    Create Plants
    Create Templates
    Load Design
    Create Systems
    Energy Analysis

    You lose points by selecting incorrect options. You may leave an option blank to avoid losing points.