Rate Structure Review

4 questions

  1. Match the file type to its use when copying rates
    .ERT
    .inp
    .GRT

    You lose points by selecting incorrect options. You may leave an option blank to avoid losing points.

  2. It is important to include applicable schedules in the rate file.
  3. If July is the peak month with a demand of 2000 KW, and there is a 12 month ratchet at 60%, how many KW's are billed for October if it has a peak of 1000 KW?
    600
    1000
    1200
    1000
  4. Where can ratchets be defined in eQuest?
    SD wizard
    Detailed interface
    DD wizard
    .inp file