Which of the following is NOT a key detail to determine baseline building parameters?
Where is the building's window to wall ratio determined in TRACE 700?
If the example file in the training was 24,000 square feet, what system type would be selected for the baseline building?
Which of the following can have the most dramatic effect on LEED points for the amount of time to find and enter the data?
If any given baseline building uses 110,000 kw-hr of energy and the proposed building uses 75,000 kw-hr of energy, what is the number of LEED points the project will earn?
If an uncovered 10,000 square foot parking lot is modeled in the proposed building with a peak power of 1 KW, what percentage of energy is saved versus the baseline building?
50%
33%
0%, the lighting remains the same
It depends on the scheduling
For chilled water systems in the baseline building, primary-secondary pumping systems are allotted 22 W/gpm
If a packaged efficiency is listed as 10 EER and it includes the Compressor, supply fan power, and condenser fan power. What is the compressor only power if the supply fan uses .1 kw/ton and the condenser uses .055 kw/ton?
Hint: 12/EER = Kw/Ton
1.2 Kw/ton
.945 kw/ton
1.045 kw/ton
If the baseline building has a VAV system that receives no fan filter credit and has a cfm of 20,000 cfm, what is the supply fan power allotment for that system?
For Climate zone 4, a building has 22% glass: Which of the following would be appropriate for the baseline building's glass properties?
How many times must the baseline building be calculated for the performance rating method?
Once only.
Twice. Calculate the actual orientation and an additional rotation of 180 degrees.
Four times. Calculate the actual orientation and 90, 180, and 270 degree variations.
For packaged equipment, std 90.1 only specifies the packaged efficiency. It is up to the modeler to determine what component gets what part of the power.
If the baseline building has a VAV system that receives no fan filter credit and has a design cfm of 20,000 cfm, what is the supply fan power at 10,000 cfm?
Which of the following is NOT a LEED automated feature of TRACE 700?
Under what conditions should a user model a 50% efficient total enthalpy wheel required in the baseline building?
For spaces with greater than 70% outside air
For systems with design air volumes greater than 5000 cfm
For systems with either 5000 cfm of design air OR 70% or greater percent outside air
Systems with over 5000 cfm design airflow AND 70% or greater outside air.
If receptacles are not specified in detail, what percentage of the baseline COST is required for receptacles?
10%
15%
25%
30%
APPENDIX G requires that building design days are determined by ASHRAE 1% weather for cooling and ASHRAE 99.6% weather for heating (or historical data)
If the proposed building design is complete, which building should generally be modeled first?
The Baseline Building
The Proposed buildling
What is the simplest way to model optimum start in TRACE 700?
Where do you enable TRACE 700 to simulate full year weather?
If there is something that cannot be modeled in the software, which of the following is acceptable?
Which of the following can be used to determine the Climate zone knowing simply the zip code?
After completing a TRACE 700 file for LEED, which of the following should you send to share the file with a colleague on a separate computer, in a separate office?
The baseline building is automatically rotated by TRACE 700 under what inputs?
Which of the following reports is the quickest way to determine the total number of unmet hours?
The maximum number of heating plants is 10
The maximum number of cooling plants is 20
If a baseline chiller plant is 3600 tons, how many chillers of what size should be modeled?
two Chillers at 1800 tons each
Four chillers at 900 tons each
5 chillers at 720 tons each
4 chillers at 800 tons and 1 chiller at 400 tons
Which of the following is NOT something that is often done in the baseline building?
If a component/measure cannot be modeled in the proposed building, what are your two options?
Use an exceptional calculation method
make an estimate and implement that in the software
Do not model the component
Use a "thermodynamically similar" component
When modeling the proposed buildings, the minimum requirements of a LEED building should already be met in the proposed design.
How should a user enter the equipment size in the proposed building?
Enter the equipment size as 100% or using the designed safety factor
Enter the EXACT tonnage determined by the original load calculations
Enter the EXACT equipment tonnage or btus per the design documents.
If the proposed building contained daylighting and external/internal shading devices, what would the baseline building contain?
Both daylighting and shading devices but with 90.1 values
The exact same daylighting and shading values
Just daylighting values with parameters defined in std 90.1
Just shading devices that match the proposed building identically
No daylighting and No shading devices
A baseline system has 4000 cfm of ventilation, which of the following spaces most closely meets the rules for spaces requiring demand control ventilation?
500 sq ft room with 20 people
10,000 sq ft room with 300 people
a 400 sq ft room with 20 people
For baseline systems 1-4, a 2 floor building with 10 thermal blocks would have 10 systems modeled.
For baseline systems 5-8, a 2 floor building with 10 thermal blocks would have 10 systems modeled in the baseline model.
The baseline building allows power consumption for Domestic hot water (at efficiency values specifed in section 7 of 90.1), even if there is no domestic hot water in the proposed building.
When Selecting packaged efficiency in TRACE 700 (under create plants), it is most important to do what in a LEED model?
When Creating thermal blocks, which of the following is NOT a benefit?
Which of the following is specifically important to the LEED report?
In general, what is the only parameter to change on the internal loads template in the baseline building?
The course was about LEED and TRACE 700 (the answer is true).
Which of the following is allowable regarding unmet hours?
Which of the following is NOT required for the VAV system in the baseline building?
When you have a file EXACTLY where you want it, what should you be done to ensure that you can recalculate and get the same results in the future?
When submitting reports, which of the following is the WORST idea?