Review Requested

9 posts / 0 new
Last post

Dear eQuesters:

Attached is a baseline for a project I am working on. I do not understand where
I went wrong, since the summary indicates significant space cooling year round.
The labs are on the right side and lower right bottom of the shell. These are
the areas with 2 small labs included. I need 8 ACH for the labs during
occupancy. These are conditioned by Sys 1.

The rest of the building consists of offices and a lecture room conditioned by
Sys 2.

Any feedback would be greatly appreciated.

Thank you,

Paul Diglio

Paul Diglio's picture
Offline
Joined: 2011-09-30
Reputation: 400