The simulation file I created with a simulation year of 2012 does not
include Feb. 29th - Leap Year.
Additionally, can someone clarify the codes for "Day/Type", the 4th
column in the hourly report file? For simulation year 2012, January 1st
is listed as Day/Type "7". Global variables 43 and 45 describe items
with "7" as Saturday. Obviously, January 1st this year was a Sunday. The
hourly report Global Variable #45 is correct as a "1".
Jonathan R. Smith AIA LEED(r)AP