Existing Building LEED Baseline

2 posts / 0 new
Last post

If the windows are existing to remain, then you are correct that they would
be the same in the proposed and baseline. If you change out windows then the
baseline would be min performance per ASHRAE.

I think your assumption about not changing the windows by orientation is
correct. I am not sure you even need to do four orientations if the
building is existing.

Erik Dyrr's picture
Offline
Joined: 2011-10-02
Reputation: 0