I?m working on a two-building university dorm with eight and six floors respectively. (using EnergyPro 5)
There are four DHW boilers ? two of 399 MBTU capacity and two of 900 MBTU capacity.
I am only allowed to enter one DHW boiler type and can then add a multiplier.
What would be the appropriate way to model this most accurately?
I was thinking of taking a weighed average value and inputting that with a boiler multiplier of four.
This would require more than a little explanation for LEED and Plan Check
Thoughts?
Thanks kindly,
Christopher F. Zabaneh