Dear all,
my second question today. I would like to be sure if my understanding is
right or not about not met loads. Currently I am trying to fill up the
LEED EA Credit 1 submittal. Section 1.3 Advisory Messages There are :
1. Number of hours heating loads not met
2. Number of hours cooling loads not met
I turn back to my e-Quest outputs ( BEPS Report) in the report I read:
a. PERCENT OF HOURS ANY SYSTEM ZONE OUTSIDE OF THROTTLING RANGE (Question:
this value is number of heating loads or should be written in LEED
submittal?)(20,9 for Proposed and 23,0 for Baseline, I am not mechanical
engineer but as much as I understood from ASHRAE number of hours not met
should not exceed 300)
b. PERCENT OF HOURS ANY PLANT LOAD NOT SATISFIED ( Question: this value is
for both number of hours heating and cooling not met or just for
Cooling?)(Both in baseline and Proposed 0,0)
regards
--
?mit Esiyok