DCV in TRACE...how it works?

2 posts / 0 new
Last post

Hello,

I've looked through the archives and have seen some information on
modeling DCV. However, I'm still unsure as to how this is modeled. The
idea of DCV is to control on an as-needed ("Demand") basis. This would
be particularly useful in situations such as conference rooms or large
meeting spaces for which you may not have a schedule. That being the
case, there really is no way to model these energy savings, is there?

I'm still baffled as to how the built-in DCV in TRACE works. Any input?

Thanks!

Martin Snarski LEED(r) AP

Snarski, Marty's picture
Offline
Joined: 2011-10-01
Reputation: 0