Hi!

I got the unmet hours fixed in my baseline model. I think it had something to do with the return air path - I had switched them from ducted to plenum (to match design case because I didn't see an App. G requirement for it) but had them as unconditioned.

Back to the sub-metering question. I missed this in my discussion with the review team -would it make sense to put ALL the process power on the sub-meter as a way to directly see it? Seems that way to me. For our project process power includes:

* Receptacles (office equipment and task lights)

* Refrigeration

* Cooking

I don't think there are any difficulties in assigning these to the sub-meter. I see there are places to directly assign them in the meter properties - is there a risk of duplicating / double-counting them if they're also entered at the zone / system inputs?

Thanks, all. Have a great Memorial Day weekend and take a moment to thank a Vet!