As part of the Estidama, the local ABU Dhabi requirements, we are required to model "building air leakage rates" on 2l/s/m? at 75Pa. Is it possible to model this in equest? The help file would suggest so if AIR-CHANGES/HR is used but this is corrected for wind speed.
Are the corrections held in the P-Inf and C-Inf (perimeter and core infiltration?) schedules or are they calculated during the simulation run?
Any help would be gratefully received.
Regards,
Steve