Exercise:
a) Model an 2nd single EEM run where the lights are upgraded to be 30% more efficient than the baseline without upgrading the furnace.
b) Model 3rd single EEM Run where the heating efficiency is updated plus the lights are updated
c) Convert the model to the DD wizard, and add a 2nd shell, attached to the same system.
Question:
If you add up the savings from the first and 2nd EEM, does it equal the savings in the 3rd EEM? Why or why not?
a) Recreate the model from the drawings. (Average time to complete: 2 hours)
a) Recreate the baseline building as done in the lesson. (Average time to complete: 3-6 hours)
a) complete the quizzes and final exam
Recreate the building from the drawing files and specifications (Average time to complete: 4-6 hours)