Hi All,

I have used the summary report to identify systems/zones with unmet
cooling hours and addressed them to the point that the report now shows
no one zone with more than 233. However, when I check the BEPS it shows
2174. I have not come across this before. I am hoping someone can shed
some light on my next move.

Thanks,

Gerry Hazel

Gerard Hazel2's picture
Offline
Joined: 2013-09-19
Reputation: 0

Gerry,

The summary report in eQUEST illustrate noncoincidental unmet load hours while the BEPS shows coincidental unmet load hours. I did not open your file, but I'm guessing you have core and perimeter zones with unmet load hours at different times due to their load profiles. When I have that many unmet cooling load hours on my BEPS reports I usually do one of the following:

1) Look for a rogue zone causing issue

2) Look at the 'big' picture (i.e. did I specify a schedule or have another input that conflicts in the model and is preventing proper cooling).

3) After exhausting all other resources, I start manually increasing my airflows in individual zones to decrease the unmet load hours.

I hope this helps.

Thanks,

David W. Griffin II

David Griffin's picture
Offline
Joined: 2011-12-07
Reputation: 0