Hello.
We are modelling residential building for LEED purposes. In room check
sum reports AIRFLOW section, Nom Vent cfm are different for cooling and
heating. We already checked that cfm and schedule are the same for
heating and cooling in CREATE ROOM airflow tab, ventilation section.
Does anyone know why even though we have the same cfm and schedule?
Thanks.