Title 24 Compliance with GSHP system

1 post / 0 new

All,

I'm doing a compliance run with my model, so equest is creating separate
"T24 Standard" and "T24 Proposed" models. The HVAC system I'm modeling
consists of WSHPs in each zone coupled to a ground loop. For some
reason, the T24 Proposed model adds in a cooling tower that isn't there
in my regular model. Has anybody run into a similar situation or have
any speculations?

Greg Collins
Design Engineer

Greg Collins's picture
Offline
Joined: 2011-09-30
Reputation: 0