System 4 PSZ-HP

2 posts / 0 new
Last post

Hello,

My baseline is a PSZ-HP and just want to confirm if I am right in using Table
6.8.1B for my minimum efficiency requirements. Ive read somewhere that?Table
6.8.1A should be used for System 4-PSZ-HP but I doubt if this is correct. Can
someone confirm this? Thank you.

From,
Jaigath

Jaigath Chandraprakash's picture
Joined: 2011-10-02
Reputation: 0