In regards to this below, I was wondering, do PV have to be subtracted from energy cost or production from the energy model report (if one uses RETscreen or PVSyst or PVWatts) and that total be reported on the NCv2.2 EAc1 template, or it does not have to be shown there but only on EAc2, or it's shown in both. It is a bit confusing.
Regards,
Catalina Caballero, AIA. Assoc., LEED GA.