Hello,
The question has come up, how does one model process loads (Manufacturing not
Plug loads), or is it not required to be part of the model.
LEED says that default process energy is 25% of the total energy for the
baseline building. If the the building's process energy is less than 25% of the
baseline building, the LEED submittal must include documentation substantiating
that process energy are appropriate. If the process load is more than 50% of the
total energy consumption, what to do?
Thanks in advance!
Bharathidhasan