Under one PD2, Modeling few buildings with different HVAC systems for each,
with dedicated Electric meter assigned to them.
When tweaking a HVAC system of any one building, other buildings
electricity consumption has some impacts, though they have no connections.
Any insight would be appreciated!
Gopi,
Do you mind explaining the systems that you have assigned to each bldg? If it comes to it, I don?t mind taking a look and providing feedback if you attach the .INP file.
_______________________________________________
Ethan Seaman
Sustainable Design Analyst
SMMA
t: 617.520.9288
www.smma.com