Modelling Mechanical Ventilation

1 post / 0 new

Dear All,

I am modelling a mechanically ventilated manufacturing facility.

Appendix G however stipulates to include a cooling system even if a cooling
system does not exists or designed. If i am to follow the said procedure of
Appendix G, it is not clear as to how the energy used for mechanical
ventilation is to be modeled in a LEED submission.

If someone could throw some light, much appreciated

regards
Anura