Dear All,
I am modelling a mechanically ventilated manufacturing facility.
Appendix G however stipulates to include a cooling system even if a cooling
system does not exists or designed. If i am to follow the said procedure of
Appendix G, it is not clear as to how the energy used for mechanical
ventilation is to be modeled in a LEED submission.
If someone could throw some light, much appreciated
regards
Anura