So I have been reviewing my proposed energy model for LEED v4 certification
and I needed to check with someone if modeling the water-side HVAC system
with one boiler is acceptable instead of modeling two boilers, which are to
be designed in the final drawings, because of the fact that only one boiler
will operate at a time instead of both operating simultaneously (part load).